People management

The practical craft of managing a small team: what a manager's output is, one-on-ones, delegation, feedback, coaching, goals, performance problems, hiring, meetings, decision rights, managing up and workload, with templates and scripts for the hard conversations. Team-level dysfunction is in five dysfunctions, intent-based delegation in mission command, owning outcomes in extreme ownership, the theories behind all of this in leadership models, and decision frameworks in decision-making models.

The manager's job

Andy Grove's High Output Management (1983) is still the best single definition. Paraphrased:

manager’s output=output of their organization+output of neighboring organizations they influence\text{manager's output} = \text{output of their organization} + \text{output of neighboring organizations they influence}

Your own tickets, code and deals count only as far as they raise the team's output. A founder-engineer who ships the most code while the team stalls has low managerial output.

Managerial leverage

Grove treats every managerial activity as having a leverage: the output it produces per hour spent. Total output is the sum of activities times their leverage, so the job is to pick high-leverage activities.

High leverage when…Example
one action affects many peoplesetting the quarter's priorities; writing an engineering principles doc
a brief intervention changes someone's work for a long timea one-hour one-on-one that unblocks a month of work; training
you supply a unique piece of knowledge or informationthe customer context only you have; the reason behind a decision
Negative leverage (Grove's examples and their modern forms)Why it hurts
meddling: doing a report's work for them, rewriting their PRremoves their ownership and learning; you become the bottleneck
indecision or late decisionsthe whole team waits
canceling one-on-ones "because we're busy"problems surface late, when they're expensive
being unavailable, then swooping inteaches people to wait for you

Task-relevant maturity

Grove argues the right management style depends not on the person in general but on their task-relevant maturity (TRM): their experience and skill with this particular task. The idea closely parallels situational leadership (below). A senior engineer starting in a new domain has low TRM there.

TRMEffective style (Grove, paraphrased)In practice
lowstructured, task-oriented: what, when and howclear specs, frequent check-ins, worked examples
mediumindividual-oriented: two-way communication, support, mutual reasoningdiscuss approaches, let them choose, review together
highminimal involvement: agree objectives, then monitoroutcome goals, regular but light reporting

The failure modes: micromanaging a high-TRM person (they leave) and abandoning a low-TRM person with "you've got this" (they flounder quietly). Monitoring is not the same as meddling: even high-TRM work needs a check-in cadence.

One-on-ones

A recurring private meeting between a manager and each direct report. Grove's view: it's the report's meeting, for their agenda, and it should be long enough to reach real issues. His point about leverage is that a short, regular investment of your time can raise the quality of their work for weeks.

PurposeNot the purpose
surface problems early, while they're cheapa status update you could read in a tracker
coaching, feedback, career growththe manager's to-do list
trust and context in both directionsperformance review ambush
hear what they won't say in a groupcanceled whenever something else comes up
CadenceWhenLength
weeklythe default; new reports; low TRM; a lot is changing30–45 min
fortnightlyexperienced, high-TRM reports in a stable period45–60 min
monthlyskip-levels (your reports' reports); mentoring30–45 min
ad hocnever a substitute for the recurring slotas needed
ONE-ON-ONE AGENDA (shared doc, newest at top)
Date: ____
 
Their items (first, and most of the time)
- ...
 
My items
- context they need: decisions, changes, what's coming
- feedback (one piece, specific)
 
Standing questions (rotate; don't ask all every week)
- What's taking more energy than it should?
- Anything I should know before I hear it elsewhere?
 
Career / growth (monthly)
- Progress on the growth goal we agreed
 
Actions
- [ ] Owner - action - by when

Question bank

TopicQuestions
openingWhat's on your mind this week? What should we make sure we cover?
blockersWhat's slowing you down? If you could remove one obstacle, which? What are you waiting on?
workloadOn a scale of 1–10, how sustainable is your load? What would you drop if you had to?
teamWho's been great to work with lately? Is there tension I should know about? What's one thing we should stop doing as a team?
manager feedbackWhat's one thing I could do differently to help you more? What am I doing that I should stop?
clarityAre priorities clear? Is there anything you're doing that you're unsure matters?
growthWhat do you want to be doing in 1–2 years? What skill would make the biggest difference? What work would stretch you?
engagementWhat part of your work do you look forward to? What part do you dread? What would make you think about leaving?
closingWhat did we decide? What do you need from me by when?

Delegation

Delegation is not binary. Management 3.0 (Jurgen Appelo, Management 3.0, 2011) defines seven levels of delegation, used in the "delegation poker" exercise and a delegation board (a grid of decision areas × levels, visible to the team).

LevelNameWho decides
1TellI decide and tell you
2SellI decide and try to convince you
3ConsultI ask for your input, then decide
4Agreewe decide together
5AdviseI give advice; you decide
6Inquireyou decide; I ask about it afterward
7Delegateyou decide; I don't need to know
DELEGATION BOARD (example: 5-person product team)
Decision area              | Level | Notes
Choice of library          |   7   | follow the tech radar
Sprint scope               |   4   | agree in planning
Hiring a new engineer      |   3   | team interviews, I decide
Production database schema |   5   | ask the staff engineer
Pricing changes            |   2   | founder decides, explains
Customer refunds under 500 |   6   | support lead, weekly log

How to hand over a task well:

  • Define the outcome and why it matters, the constraints, and the deadline, not the method (see mission command for commander's intent).
  • Name the delegation level explicitly: "You decide; tell me afterward."
  • Agree the check-in points and what "done" means before work starts.
  • Delegate whole problems where possible, including the interesting parts, not just the leftovers.
  • When it's done differently from how you'd have done it, ask whether it's worse or just different.

Situational leadership

Paul Hersey and Ken Blanchard proposed the "life cycle theory of leadership" in 1969, renamed Situational Leadership in the 1970s. Style should match the follower's readiness for the specific task. Blanchard later produced his own version, SLII (1985, in Leadership and the One Minute Manager), with different labels, and the two versions are now sold by separate companies.

StyleOriginal (Hersey–Blanchard)SLII (Blanchard)Directive / supportiveMatches
S1TellingDirectinghigh / lowR1: unable and unwilling or insecure · D1: enthusiastic beginner (low competence, high commitment)
S2SellingCoachinghigh / highR2: unable but willing or confident · D2: disillusioned learner (some competence, low commitment)
S3ParticipatingSupportinglow / highR3: able but unwilling or insecure · D3: capable but cautious performer
S4DelegatingDelegatinglow / lowR4: able and willing · D4: self-reliant achiever

Note the two versions order readiness differently: in SLII the beginner starts enthusiastic (D1) and dips in commitment at D2. Evidence quality: widely taught, weakly supported. Empirical tests, for example Thompson and Vecchio (2009, Leadership Quarterly), found little support for its specific prescriptions. Use it as a prompt ("am I over- or under-supervising this person on this task?"), not as a science.

Feedback

SBI and SBII

The Center for Creative Leadership's Situation–Behavior–Impact model keeps feedback specific and about behavior, not character. The SBII variant adds Intent: ask what they were trying to do.

StepDoExample
Situationwhen and where, specifically"In this morning's planning meeting…"
Behaviorobservable action, no judgment"…you cut Priya off twice while she was presenting the estimate…"
Impactthe effect on you, the team, the work"…she stopped talking and we committed to a date she thinks is wrong."
Intent (SBII)ask, then listen"What was going on for you?"

Bad: "You're rude in meetings." Good: the table above. For praise, the same structure makes it believable and repeatable: "In yesterday's incident, you posted updates every 15 minutes; support could answer customers without pinging us."

Radical Candor

Kim Scott's Radical Candor (2017) crosses two axes: care personally and challenge directly.

Low challengeHigh challenge
High careruinous empathy: nice, vague, lets problems growradical candor: kind and clear
Low caremanipulative insincerity: flattery to your face, criticism behind your backobnoxious aggression: "brutal honesty" without care
  • Most new managers fail into ruinous empathy: they like their reports and avoid the discomfort, so the person finds out about the problem at review time or when they're let go.
  • Scott's framing is about behavior in a given moment, not a personality label ("you did something obnoxiously aggressive", not "you are an obnoxious aggressor").
  • Ask for criticism before you give it, and show you can take it.

Why not the feedback sandwich

Praise, criticism, praise. It's discouraged because:

  • the criticism gets lost or softened, so the person remembers the praise and misses the point;
  • people learn the pattern and start discounting praise as a warm-up for bad news;
  • it feels manipulative to experienced recipients, which damages trust.

Instead: give praise and criticism separately and often, each specific. The evidence base for any particular feedback format is thin; what's consistently supported is that feedback should be timely, specific, about behavior and the task rather than the person.

Feedback ruleWhy
soon: within a day or twomemory is fresh; it's clearly about this event
private for criticism, public or private for praisepublic criticism triggers defense, not learning
one issue at a timea list feels like an attack and none of it lands
about behavior, not traitsbehavior can change; "you're careless" can't be acted on
ask, then listenthere's often context you don't have
follow upnotice and say when the behavior changes

Coaching

GROW was first published by John Whitmore in Coaching for Performance (1992); the name is credited to Max Landsberg and Graham Alexander, and the model was in use before it was named. Coaching means helping someone find their own answer; use it when they have the ability and need to build judgment. When someone lacks the knowledge, teach instead.

StageAimQuestions
Goalwhat they want from this conversation and beyondWhat would a great outcome look like? What do you want to leave this conversation with?
Realitythe current situation, facts not opinionsWhat's happening now? What have you tried? What's in your control? What's the evidence?
Optionspossible actions, widelyWhat could you do? What else? What would you do if you had no constraints? What would someone you admire do?
Will / way forwardcommitmentWhat will you do, by when? What might get in the way? How committed are you, 1–10? What would make it a 10?

Coaching habits that matter more than the model:

  • Ask one question at a time, then stay quiet.
  • Resist giving the answer; if you must, offer it as one option among several.
  • "What else?" is the most useful follow-up.
  • End with a specific commitment and a date.

Goals: OKRs and SMART

OKRs

Objectives and key results came from Andy Grove at Intel in the 1970s (described in High Output Management). John Doerr learned them at Intel in 1975 and introduced them to Google in 1999; Measure What Matters (2018) is his book on them.

  • Objective: qualitative, inspiring, time-bound: what you want.
  • Key results: 3–5 measurable outcomes that show the objective was met: how you'll know.
  • Google distinguishes committed OKRs (expected to be fully met, scored 1.0) from aspirational or stretch OKRs (expected to average around 0.7).
OBJECTIVE: New customers get value on day one
  KR1 Median time-to-first-report falls from 3 days to 4 hours
  KR2 Onboarding completion rises from 42% to 70%
  KR3 Day-7 retention of new accounts rises from 55% to 65%
  (not KRs: "build new onboarding flow", "run 5 interviews";
   those are tasks that serve the KRs)
Type: aspirational. Score at quarter end 0.0-1.0 per KR.
Common OKR failureFix
key results are tasks ("launch X")measure the outcome the task is meant to change
too many: 8 objectives × 5 KRs1–3 objectives per team per quarter
individual OKRs used for performance reviewkeep OKRs at team level; people sandbag if pay depends on them
set and forgottenreview weekly or fortnightly; update confidence
all stretch, or all committedlabel each; don't punish a 0.7 on a stretch goal
business-as-usual work written as OKRskeep "keep the lights on" as health metrics, not OKRs
cascaded top-down onlyteams propose; leaders align

SMART

From George T. Doran, "There's a S.M.A.R.T. way to write management's goals and objectives" (Management Review, November 1981). His original letters: Specific, Measurable, Assignable, Realistic, Time-related. Later versions swap in Achievable, Relevant and others. SMART suits individual development goals and committed deliverables; it is a poor fit for exploratory work where the target isn't knowable yet, and Doran himself noted not every objective can be quantified.

Performance management

Most performance problems are expectation problems. Before concluding someone is underperforming, check:

QuestionIf "no"
Did they know, specifically, what good looks like?write it down with them
Have they had direct, specific feedback that there's a gap?give it now (SBI)
Do they have the skill, tools, information and time?train, resource, or re-scope
Is something outside work going on?ask, adjust temporarily, point to support
Is the role still the right fit?consider a different role before an exit

PIPs done honestly

A performance improvement plan is a written, time-boxed set of expectations. Be honest about which kind you are running:

  • A real improvement plan: you believe they can succeed; goals are achievable; you'll invest coaching time. Say so.
  • A documented exit: you've already decided. Then a PIP is cruel theatre. A direct conversation and a fair severance are usually kinder and cleaner.
PERFORMANCE PLAN (real improvement version)
Role expectation: ______________________________
Gap (specific, with examples and dates): ________
What success looks like by [date] (measurable):
  1. ...
  2. ...
Support I will provide: weekly 30-min check-in;
  pairing with ____; training on ____
Check-ins: [dates]
If the goals are met: plan closes, noted as resolved.
If not met: next step is ____ (be explicit).
Signed/acknowledged: ____  Date: ____

Firing well

  • No surprises: the person should already know from earlier conversations that their job was at risk.
  • Decide first, then have a short conversation; don't negotiate or relitigate in the meeting.
  • Do it early in the week, in private, with HR or a witness if needed, and with logistics ready (pay, equipment, access, what the team will be told).
  • Be generous where you can: severance, a reference for what they did well, time to say goodbye if appropriate.
  • Tell the team promptly and briefly, without disparaging the person.
  • Employment law varies widely by country and state; get advice before any dismissal.

Hiring

What predicts job performance

Schmidt and Hunter's 1998 meta-analysis (Psychological Bulletin) put structured interviews, work samples and general mental ability (GMA) tests at the top. Sackett, Zhang, Berry and Lievens (2022, Journal of Applied Psychology) showed that earlier corrections for range restriction were overdone: most validity estimates fall by about .10–.20, and structured interviews became the top-ranked procedure.

MethodSchmidt & Hunter 1998Sackett et al. 2022
structured interview.51.42
work sample test.54.33
general mental ability test.51.31
unstructured interview.38.19
  • Values are corrected correlations with job performance. Even .42 leaves most variance unexplained: the 80% credibility interval for structured interviews runs from about .18 to .66.
  • Structured means: the same job-related questions for every candidate, anchored rating scales, scoring each answer independently before discussing, and multiple interviewers.
  • Unstructured "chat and gut feel" interviews are half as predictive and let bias in.

Scorecards and the A method

Geoff Smart and Randy Street's Who: The A Method for Hiring (2008) has four steps:

  1. Scorecard: the role's mission, 3–8 measurable outcomes, and the competencies required.
  2. Source: build a pipeline, mostly from referrals, before you need it.
  3. Select: a screening interview, a chronological career interview (their "Who interview"), focused interviews on scorecard outcomes, and reference interviews.
  4. Sell: persuade the candidate you want.
ROLE SCORECARD
Mission (1 sentence): why this role exists
Outcomes (measurable, 12 months):
  1. Ship X so that Y improves from A to B by [date]
  2. ...
Competencies (5-8, each defined):
  - Ownership: fixes problems outside their lane
  - ...
Interview plan: which interviewer probes which outcome
  or competency, with which questions.
Rating: 1-4 per competency, anchored examples for 1 and 4,
  scored before the debrief.
Hiring mistakeFix
hiring for "culture fit", meaning "like us"define the values and behaviors; assess those
everyone asks the same easy questionsassign each interviewer specific competencies
debrief where the most senior voice anchors everyonewritten scores submitted before discussion
hiring fast to relieve paina bad hire costs more than a gap; keep the bar
no work sample for a skills rolea short, paid or time-boxed realistic task

Meetings

Grove splits meetings into process-oriented (regularly scheduled: one-on-ones, staff meetings, operations reviews) and mission-oriented (called to solve a specific problem or make a decision, often once).

MeetingPurposeCadenceKeys
one-on-onethe report's issues, coachingweeklytheir agenda first
team or staff meetingcross-team issues, decisions, contextweeklyagenda sent in advance; decisions recorded
standupcoordination and blockersdaily or asyncunder 15 min; problems taken offline
decision meetingmake one decisionas neededpre-read; named decider; options on paper
retroimprove how the team worksper sprint or projectblameless; one or two changes, with owners
all-handscontext, direction, recognitionmonthlyQ&A, including anonymous questions

Written pre-reads. Amazon does no slide presentations: teams write narratively structured six-page memos, read silently at the start of the meeting in a kind of "study hall" (Bezos, 2017 shareholder letter). The memo forces complete thinking; the silent read ensures everyone has actually read it. See persuasive writing for how to write one.

DECISION MEMO (1-2 pages, sent 24h before)
Decision needed: one sentence. Decider: name. By: date.
Context: what's true now, with numbers.
Options:
  A. ... Pros / cons / cost / risk
  B. ...
  C. Do nothing: what happens
Recommendation and why.
What would change our mind.
Reversibility: one-way door or two-way door?

Meeting hygiene: no agenda, no meeting; start with the decision needed; end with decisions, owners and dates; shortest default length the calendar allows; anyone may leave a meeting they're not contributing to.

Decision rights: RACI and DACI

Most slow decisions have unclear decision rights, not hard trade-offs.

RACIMeaning
Responsibledoes the work (can be several)
Accountableowns the outcome and signs off; exactly one person
Consultedgives input before the decision (two-way)
Informedtold after (one-way)
DACI (Atlassian's version)Meaning
Driverruns the process: gathers stakeholders and information, gets a decision by the agreed date
Approverthe one person who makes the decision
Contributorshave expertise and a voice, but no vote
Informedtold once it's made

RACI suits ongoing responsibilities; DACI suits one-off decisions. The rule that matters in both: one accountable person or approver. Two approvers means nobody is.

Managing up

John Gabarro and John Kotter's "Managing Your Boss" (Harvard Business Review, 1980) argues the boss relationship is one of mutual dependence that you should manage deliberately. Their advice, paraphrased: understand your boss's goals, pressures, strengths, weaknesses and preferred working style; understand your own; and build a relationship that suits both, keeping them informed, being dependable and honest, and using their time selectively.

DoDon't
learn how they like information: written or verbal, detail or summarysend the same format to every boss
bring problems early, with a recommendationsurprise them, especially in public
make their goals your team's priorities, or argue openly to change themquietly work on a different agenda
write a short weekly update: progress, risks, asksmake them chase you for status
disagree in private, commit in publicundermine a decision to your team
ask what they'd need from you to delegate morewait to be given autonomy
WEEKLY UPDATE TO YOUR MANAGER (5 minutes to read)
Headline: on track / at risk / off track, one line why
Done this week: 3 bullets, outcomes not activity
Next week: 3 bullets
Risks: what might slip, what I'm doing about it
Asks: decisions or help I need from you, by when
People: anything about the team you should know

Maker's schedule vs manager's schedule

Paul Graham's essay "Maker's Schedule, Manager's Schedule" (July 2009): managers work in one-hour slots; makers (programmers, writers) need half-day blocks at least. "A meeting commonly blows at least half a day, by breaking up a morning or afternoon." His fix was office hours clustered at the end of the day.

  • As a founder-engineer you're on both schedules. Protect maker blocks deliberately (for example, mornings) and batch meetings into the rest of the day.
  • Give your team the same protection: meeting-free days or blocks, async standups, and your own one-on-ones next to their existing meetings rather than in the middle of a clear afternoon.
  • The more reports you have, the less maker time you'll get. A common rule of thumb: past about 5–8 reports, stop owning critical-path work and keep coding on things nobody is blocked by.

Burnout and workload

The WHO's ICD-11 describes burn-out as an occupational phenomenon (not a medical condition) resulting from chronic workplace stress that has not been successfully managed, with three dimensions: energy depletion or exhaustion; increased mental distance from, or cynicism about, one's job; and reduced professional efficacy.

SignalWhat you might see
exhaustionlate-night messages, missed holidays, "just tired", more sick days
cynicismsarcasm about the product or leadership, "what's the point", withdrawal from discussions
reduced efficacyquality slipping in someone who used to be strong, decisions avoided, more errors
changesa talkative person goes quiet, or the reverse; camera off; shorter answers

Christina Maslach and Michael Leiter's work links burnout to mismatches in six areas of work life: workload, control, reward, community, fairness and values. Only the first is about hours; the others are about how the work is managed.

What a manager can do:

  • Ask directly in one-on-ones: "How sustainable is your load, 1 to 10?" Act on anything under 6.
  • Cut scope, not quality or sleep. Say out loud what the team will stop doing.
  • Treat heroics as a process failure to fix, not a culture to celebrate.
  • Model it: take your holiday, don't send messages at midnight (schedule them).
  • Rotate on-call and unglamorous work fairly.
  • Know the support available (employee assistance program, health cover) and point people to it; you're not a therapist.

Scripts for hard conversations

Keep them short, specific and kind. Say the headline in the first sentence.

UNDERPERFORMANCE (first direct conversation)
"I want to talk about the last two sprints. Three of your
five tickets slipped, and the payment bug went to
production without tests. That's below what the role
needs, and I'm worried about it. What's going on from
your side?"
[listen]
"Here's what I need to see over the next four weeks: ...
What support would help? Let's check in every Friday."
BEHAVIOR THAT AFFECTS THE TEAM
"In Tuesday's design review you called Sam's proposal
'junior-level thinking'. Sam didn't speak for the rest of
the meeting, and two people mentioned it to me. I need
disagreement to be about the idea, not the person. Can you
tell me how you saw it?"
SAYING NO TO A PROMOTION (for now)
"I'm not putting you forward this cycle. You're strong on
X and Y. The gap for senior is Z: leading a project across
teams end to end. Here's a project that would show it.
If you deliver it, I expect to put you forward next cycle."
LAYING SOMEONE OFF (role eliminated)
"I have difficult news. We're reducing the team and your
role is one of those affected. Today is your last working
day. This is a business decision, not a judgment of your
work. [HR name] will take you through pay, notice and
benefits. I'll gladly be a reference for you."
RECEIVING CRITICISM FROM A REPORT
"Thank you for telling me. That can't have been easy.
Can you give me an example so I understand it properly?"
[listen, don't defend]
"I'm going to think about this and try ___. Tell me
if you don't see a difference in a couple of weeks."

First 90 days as a new manager

Michael Watkins' The First 90 Days (2003) is the standard book on leadership transitions. A checklist for a first-time manager of a small team:

DAYS 1-30: LISTEN AND LEARN
[ ] One-on-one with every report: goals, frustrations,
    how they like feedback, what they'd change
[ ] Meet your manager: their expectations, how they'll
    judge success at 90 days and at a year
[ ] Meet key peers and stakeholders: what they need from
    your team, what's not working
[ ] Read the last quarter's docs, metrics, incidents
[ ] Set up weekly one-on-ones and a team meeting
[ ] Don't change processes yet, unless something's on fire
 
DAYS 31-60: CLARIFY AND DECIDE
[ ] Write a one-page team charter: purpose, priorities,
    how we work, what we won't do
[ ] Agree team goals or OKRs with your manager
[ ] Pick one or two early wins that matter to the team
[ ] Make the delegation levels explicit (delegation board)
[ ] Give your first specific feedback, positive and
    corrective
 
DAYS 61-90: IMPROVE AND BUILD
[ ] Fix the biggest process pain the team named
[ ] Address any performance issue you've confirmed
[ ] Agree a growth goal with each report
[ ] Ask the team and your manager for feedback on you
[ ] Plan the next quarter

Common new-manager mistakes

Linda Hill's research on new managers (Becoming a Manager, 1992; "Becoming the Boss", HBR 2007) found they expect their authority to come from the position and to control their reports, then discover that authority has to be earned through credibility and that the job is building the team, not managing individuals one by one.

MistakeBetter
still acting as the best individual contributormeasure yourself by team output (Grove)
taking over when things get hardcoach; delegate at the right level; accept "different"
avoiding hard feedback to stay likedradical candor: care and challenge
treating everyone the same wayadjust to task-relevant maturity
canceling one-on-onesprotect them; move, don't cancel
being a friend firstbe friendly, fair and consistent; friendship with reports gets complicated
hiding problems from your bossbad news early, with a plan
shielding the team from all contextshare the why; people make better decisions with it
changing everything in the first monthlisten for 30 days first
ignoring your own workload and learningget a mentor or peer group of managers

References